Hastière - Dam

image
image
image
image
image
  • thumbImage
  • thumbImage
  • thumbImage
  • thumbImage
  • thumbImage
Demolition and reconstruction of the dam with shut-off valve in the Upper-Meuse. Construction and raising of the banks and other small works at the lock. Construction and equipment of the harbour master’s office. This project was realized with a temporary partnership.

client

MWET DG 232 Direction des Voies Hydrauliques

design

MWET DG 232 Direction des Voies Hydrauliques

site

Plein Sud, 5540 Hastière, België

price

9.000.000 €

execution

1998-2002

by

  • Artes TWT