Artes

references

Huy - Palace of Justice

image
image
image
image
  • thumbImage
  • thumbImage
  • thumbImage
  • thumbImage
Cleaning of the walls, replacement of the windows, replacement of the roof, manufacture and installation of concrete tiles and sails, replacement and strengthening of the floorboards, creation of new openings in the upper levels of the facades, renewal of the guttering and piping and their better connection to the public drainage system, renovation/addition of sanitary facilities and utilities, installation of new fencing/barriers, installation of new floors, repairs to existing platforms and the construction of several new ones, the creation of an internal route and a new car park, the repair of walls and fences along the Luiksesteenweg, etc.. Particularly noteworthy was the use of a temporary protective cover stretched over the building, so that damage or delay as a result of poor weather could be avoided. At the end of the project, the roof was restored to its original position and condition.

client

REGIE DES BATIMENTS

design

J.C. CHALTIN

site

Chaussée de Liège 75, 4500 Huy, België

price

€ 1.500.000

execution

2006-2007

by

  • Artes TWT