Artes

references

Rhisnes - Line 161

image
image
image
image
image
  • thumbImage
  • thumbImage
  • thumbImage
  • thumbImage
  • thumbImage
Elevation work on flat ground (110,000 tons). Ground work on rocky terrain (145,000 tons). Masonry work (355m_ of rubble walls). Anchoring (200m_). The work was carried out without interruption to the train schedule, the railway tracks being full protected by landslide-resistant netting.

client

INFRABEL Direction Infrastructure & Achats Zone de Liège

design

site

Rue d'Emines 15, 5080 La Bruyère, België

price

€ 4.900.000

execution

2004-2007

by

  • Artes TWT